Knox County
Board of Commissioners — Spending approved
Every dollar figure written into a motion the body adopted, added up. Each amount is copied verbatim from the motion text — nothing here is inferred or estimated.
Excludes 13 motions not yet published. Contested and deferred votes publish only after review, so this total can run low until the queue clears.
$2,466,681,397.41
total approved in adopted motions
1,448
adopted motions carrying an amount across 1,825 figures
≈ $5,150 per resident
using 478,971 residents (U.S. Census Bureau, 2020 Decennial Census, 2020)
By year & quarter
| Period | Adopted motions | Approved |
|---|---|---|
| 2026 | 124 | $448,473,389.43 |
| Q3 2026 | 47 | $387,577,429.28 |
| Q2 2026 | 40 | $25,817,537.10 |
| Q1 2026 | 37 | $35,078,423.05 |
| 2025 | 239 | $290,217,846.23 |
| Q4 2025 | 51 | $40,681,936.32 |
| Q3 2025 | 70 | $84,589,560.24 |
| Q2 2025 | 70 | $137,702,551.85 |
| Q1 2025 | 48 | $27,243,797.82 |
| 2024 | 276 | $476,024,654.86 |
| Q4 2024 | 59 | $36,965,012.30 |
| Q3 2024 | 76 | $73,473,828.45 |
| Q2 2024 | 80 | $77,568,352.74 |
| Q1 2024 | 61 | $288,017,461.37 |
| 2023 | 274 | $469,513,300.92 |
| Q4 2023 | 72 | $43,245,206.22 |
| Q3 2023 | 59 | $111,034,248.86 |
| Q2 2023 | 73 | $257,836,378.08 |
| Q1 2023 | 70 | $57,397,467.76 |
| 2022 | 225 | $243,403,890.18 |
| Q4 2022 | 55 | $57,958,186.68 |
| Q3 2022 | 54 | $37,707,727.22 |
| Q2 2022 | 79 | $104,855,064.56 |
| Q1 2022 | 37 | $42,882,911.72 |
| 2021 | 223 | $330,542,028.89 |
| Q4 2021 | 50 | $20,721,179.29 |
| Q3 2021 | 61 | $84,300,820.92 |
| Q2 2021 | 56 | $75,555,986.22 |
| Q1 2021 | 56 | $149,964,042.46 |
| 2020 | 87 | $208,506,286.90 |
| Q4 2020 | 58 | $20,810,108.50 |
| Q3 2020 | 29 | $187,696,178.40 |
Every decision counted
Each adopted motion above, with the amount(s) written into it. Follow any link to the full decision and its source minutes.
-
Approve contract with Powerschool Group, LLC for Technology Solutions, Products, and Services. $250,000
Aug 31, 2026 · $250,000.00
-
Aug 31, 2026 · $25,000.00
-
Aug 31, 2026 · $60,000.00
-
Aug 31, 2026 · $929,844.30 to Solway Road · $911,247.41 · $18,596.89
-
Aug 31, 2026 · $852,000.00
-
Aug 31, 2026 · $4,396,415.48
-
Aug 31, 2026 · $155,000,000
-
Aug 31, 2026 · $426,800.00
-
Aug 31, 2026 · $110,000.00
-
Aug 31, 2026 · $31,677.60
-
Aug 31, 2026 · $250,000.00
-
Aug 31, 2026 · $20,000.00
-
Aug 31, 2026 · $170,900.00
-
Aug 31, 2026 · $30,250.00
-
Aug 31, 2026 · $108,000.00
-
Aug 31, 2026 · $52,570.98
-
Aug 31, 2026 · $100,000.00
-
Aug 31, 2026 · $80,000.00
-
Aug 31, 2026 · $63,000.00
-
Aug 31, 2026 · $22,500.00
-
Aug 31, 2026 · $17.50
-
Aug 31, 2026 · $40,273.00
-
Approve construction contract with Whaley Construction for Gibbs Pedestrian Bridge Project. $2,844,120.38
Aug 31, 2026 · $2,844,120.38 to Whaley Construction
-
Aug 31, 2026 · $70,463.00
-
Aug 31, 2026 · $155,000,000
-
Aug 31, 2026 · $7,000.00
-
Approve agreement with BC Technologies Company DBA FinalForms for athletic registration platform $46,575
Jul 27, 2026 · $10,000.00 · $13,475.00 · $23,100.00
-
Approve consolidated grant application and receipt of funds from TN Dept. of Education for federal grants $24,882,417.06
Jul 27, 2026 · $24,882,417.06
-
Approve TN Dept. of Education FY27 Carl D. Perkins Career and Technical Education Grant $1,102,186.34
Jul 27, 2026 · $1,102,186.34
-
Jul 27, 2026 · $21,447.01
-
Jul 27, 2026 · $430,500.00
-
Jul 27, 2026 · $2,000.00
-
Approve Amendment Two to Grant Contract with TN Dept. of Health for Family Planning Services $4,149,000
Jul 27, 2026 · $4,149,000.00
-
Jul 27, 2026 · $69,800.00
-
Approve consolidated grant application and receipt of funds for IDEA Part B and Preschool grants $15,787,559
Jul 27, 2026 · $15,313,227.00 · $474,332.00
-
Jul 27, 2026 · $45,000.00
-
Approve Supplement 2 to JMT agreement for Clinton Hwy/W. Beaver Creek Dr. intersection improvements $41,350
Jul 27, 2026 · $41,350.00
-
Jul 27, 2026 · $123,386.00
-
Jul 27, 2026 · $71,741.25
-
Jul 27, 2026 · $75,000.00
-
Jul 27, 2026 · $7,570,075.08
-
Approve MOU with SSP International for teacher stipends for chemistry curriculum field test $106,000
Jul 27, 2026 · $70,000.00 · $36,000.00
-
Jul 27, 2026 · $7,000.00
-
Approve Local Agency Project Agreement with TDOT for Thorn Grove Pike/Midway Road project $10,750,000
Jul 27, 2026 · $10,250,000.00 · $250,000.00 · $250,000.00 to Knox County
-
Jul 27, 2026 · $127,500.00 · $127,500.00 to CDM Smith Inc
-
Jul 27, 2026 · $55,216.00
-
Jul 27, 2026 · $115,500.00
-
Approve Metro DAS contract $15,000
Jun 22, 2026 · $15,000.00
-
Jun 22, 2026 · $500,000.00
-
Approve TBI/DTDF overtime reimbursement $22,155.25
Jun 22, 2026 · $22,155.25
-
Approve TEMA grant $389,100
Jun 22, 2026 · $389,100.00
-
Jun 22, 2026 · $1,001,989.00
-
Jun 22, 2026 · $10,000.00
-
Jun 22, 2026 · $1,500.00
-
Approve Anixter networking materials $1,000,000
Jun 22, 2026 · $1,000,000.00
-
Approve FY2027 Turnaround Action Grant 6 $1,328,728
Jun 22, 2026 · $1,328,728.00
-
Approve Knox County Schools grant/donations $147,986.85
Jun 22, 2026 · $147,986.85
-
Approve HIDTA overtime reimbursement $120,000
Jun 22, 2026 · $120,000.00
-
Accept $3,078 K9 donation $3,078
Jun 22, 2026 · $3,078.00
-
Jun 15, 2026 · $2,680,846.33
-
Jun 15, 2026 · $0.02
-
Jun 15, 2026 · $8,759,000.00
-
Closure of Wye Way Lane terminus $55,216
May 18, 2026 · $55,216.00
-
May 18, 2026 · $150,000.00 to Avertest
-
May 18, 2026 · $262,100.00
-
May 18, 2026 · $35,000.00
-
May 18, 2026 · $67,442.50
-
May 18, 2026 · $330,000.00
-
May 18, 2026 · $100,000.00
-
May 18, 2026 · $200,000.00
-
May 18, 2026 · $65,000.00 · $13,000.00
-
May 18, 2026 · $78,072.50 · $234,217.50
-
May 18, 2026 · $361,710.36 to D.R. Phillips
-
May 18, 2026 · $3,500.00
-
May 18, 2026 · $361,710.36 to D.R. Phillips
-
May 18, 2026 · $73,790.00 · $46,690.00 · $27,100.00
-
Apr 27, 2026 · $194,907.00 to CSXT
-
Apr 27, 2026 · $103,100.00 to Ardurra
-
Approve Grant Agreement with Morgan Wallen Foundation for Gibbs HS athletic field upgrades. $1,200,000
Apr 27, 2026 · $1,200,000.00
-
Apr 27, 2026 · $1,644,433.00 to Whaley Construction
-
Apr 27, 2026 · $1,187,886.00 · $438,318.43
-
Approve Grant Agreement with Morgan Wallen Foundation for Gibbs HS athletic field upgrades. $1,200,000
Apr 27, 2026 · $1,200,000.00
-
Apr 27, 2026 · $250,000.00 to Helen Ross McNabb Center
-
Apr 27, 2026 · $1,000.00
-
Apr 27, 2026 · $1,000.00
-
Apr 27, 2026 · $183,392.00 · $733,568.00
-
Apr 27, 2026 · $236,000.00
-
Mar 23, 2026 · $14,200.00
-
Mar 23, 2026 · $135,000.00
-
Mar 23, 2026 · $171,071.00
-
Mar 23, 2026 · $281,108.05 · $144,813.24
-
Mar 23, 2026 · $1,755,213.10
-
Mar 23, 2026 · $268,891.32
-
Mar 23, 2026 · $8,610,000.00
-
Mar 23, 2026 · $62,700.00
-
Mar 23, 2026 · $199,765.46
-
Mar 23, 2026 · $30,000.00
-
Mar 23, 2026 · $5,000.00
-
Mar 23, 2026 · $500.00
-
Mar 23, 2026 · $152,420.00
-
Mar 23, 2026 · $5,622.00
-
Mar 23, 2026 · $380,500.00
-
Mar 23, 2026 · $429,064.02 · $221,032.98
-
Mar 23, 2026 · $278,752.00
-
Mar 23, 2026 · $565,745.00 · $554,430.10 · $11,314.90
-
Mar 23, 2026 · $20,000.00 · $89,580.00
-
Feb 25, 2026 · $10,518.72
-
Feb 25, 2026 · $744,983.34 to Everett Pointe LP
-
Feb 25, 2026 · $3,800,000.00
-
Approve construction contract for George Light Road widening $13,372,724.62
Feb 25, 2026 · $244,033.60 to PRI of East Tennessee · $146,532.76 · $5,000.00 · $284.32 · $2,400,000.00 · $1,168,728.00 · $866,760.00 · $300,000.00 · $20,430.00 · $565,745.00 · $124,200.00 · $1,291,600.00 · $70,000.00 · $1,298,600.00 · $811,200.00 · $20,000.00 · $89,580.00 · $10,518.72 · $68,290.76 · $1,602,321.50 · $17,000.00 · $171,400.00 · $56,858.87 · $150,000.00 · $1,873,641.09
-
Jan 29, 2026 · $27,962.00
-
Approve Grant Acceptance Agreement with Mr. Holland's Opus Foundation for musical instruments $38,717
Jan 29, 2026 · $38,717.00
-
Jan 29, 2026 · $242,772.00
-
Jan 29, 2026 · $21,900.00
-
Approve Grant Contract with TN Dept. of Environment and Conservation for brownfield remediation $500,000
Jan 29, 2026 · $500,000.00
-
Jan 29, 2026 · $8,857.00 · $18,857.00
-
Jan 29, 2026 · $8,857.00 · $25,857.00
-
Jan 29, 2026 · $125,000.00
-
Jan 29, 2026 · $5,000.00
-
Approve contract with Rummel, Klepper & Kahl, LLP for Gibbs Pedestrian Bridge CEI services $1,139,266.20
Jan 29, 2026 · $569,633.10 · $569,633.10 to Rummel
-
Jan 29, 2026 · $180,000.00 · $45,000 · $225,000 · $45,000 to School Action Plan
-
Jan 29, 2026 · $23,000.00
-
Jan 29, 2026 · $8,857.00 · $33,857.00
-
Jan 29, 2026 · $8,857.00 · $30,857.00
-
Dec 15, 2025 · $350.00
-
Dec 15, 2025 · $647,746.00
-
Authorize acceptance of grant from National Endowment for Arts for Children's Festival of Reading $20,000
Dec 15, 2025 · $20,000.00
-
Authorize acceptance of donation from Knoxville Wholesale Furniture for Employee Assistance Fund $40,000
Dec 15, 2025 · $40,000.00
-
Dec 15, 2025 · $575,059.88
-
Approve agreement with Robert G. Campbell & Assoc. for driver training facility engineering $132,200
Dec 15, 2025 · $132,200.00
-
Dec 15, 2025 · $6,000.00
-
Dec 15, 2025 · $4,100.00
-
Dec 15, 2025 · $120,300.00
-
Dec 15, 2025 · $125,000.00
-
Dec 15, 2025 · $45,900.00
-
Dec 15, 2025 · $1,561.00
-
Dec 15, 2025 · $11,500.00
-
Dec 15, 2025 · $50,000.00
-
Dec 15, 2025 · $14,598.00
-
Nov 17, 2025 · $9,665.00
-
Nov 17, 2025 · $58,847.00
-
Nov 17, 2025 · $2,250,000.00
-
Nov 17, 2025 · $21,200.00
-
Nov 17, 2025 · $3,000.00
-
Nov 17, 2025 · $500,775.00 to McCarty Holsaple McCarty
-
Nov 17, 2025 · $3,783,261.00
-
Nov 17, 2025 · $67,992.95 to Skilled Services
-
Approve TN Dept. of Education school security grant. $1,863,482.22
Nov 17, 2025 · $1,184,319.69 · $679,162.53
-
Nov 17, 2025 · $7,457.00
-
Nov 17, 2025 · $1,349,500.00
-
Nov 17, 2025 · $12,000.00
-
Nov 17, 2025 · $1,500,000.00 · $500.00
-
Nov 17, 2025 · $12,000,000.00 to Exceed
-
Nov 17, 2025 · $293,742.00
-
Nov 17, 2025 · $130,071.00
-
Nov 17, 2025 · $28,077.00 · $172,077.00
-
Nov 17, 2025 · $4,575.00 to McCarty Holsaple McCarty
-
Nov 17, 2025 · $1,567,732.00
-
Oct 27, 2025 · $750,000.00
-
Oct 27, 2025 · $680,000.00
-
Oct 27, 2025 · $125,000.00
-
Oct 27, 2025 · $200,000.00
-
Approve fund balance designations for school technology, roof, bus pay, and construction. $7,628,183
Oct 27, 2025 · $7,628,183.00
-
Oct 27, 2025 · $74,760.00
-
Oct 27, 2025 · $102,482.00
-
Oct 27, 2025 · $20,500.00
-
Oct 27, 2025 · $3,099,352.00 to Whaley Construction
-
Oct 27, 2025 · $18,173.00
-
Oct 27, 2025 · $75,000.00 to Stones River Group · $6,250.00
-
Oct 27, 2025 · $359,967.27
-
Oct 27, 2025 · $25,000.00
-
Oct 27, 2025 · $50,000.00
-
Oct 27, 2025 · $10,000.00
-
Oct 27, 2025 · $22,000.00
-
Oct 27, 2025 · $17,000.00
-
Sep 22, 2025 · $4,623.75 · $4,623.75 to June
-
Sep 22, 2025 · $106,317.87
-
Sep 22, 2025 · $228,014.00
-
Sep 22, 2025 · $716,012.00 · $8,988,388.00
-
Sep 22, 2025 · $20,000.00 · $25,000.00
-
Sep 22, 2025 · $899,072.55
-
Sep 22, 2025 · $100,000.00
-
Sep 22, 2025 · $8,094.50
-
Sep 22, 2025 · $12,615.00
-
Sep 22, 2025 · $1,318,100.00
-
Approve TN Dept. of Education FY2026 VPK Grant. $3,673,323.48
Sep 22, 2025 · $2,173,178.03 · $1,500,145.45
-
Sep 22, 2025 · $115,000.00
-
Sep 22, 2025 · $340,577.50 · $340,577.50 to APAC-Atlantic
-
Sep 22, 2025 · $50,000.00
-
Sep 22, 2025 · $711,055.00
-
Aug 25, 2025 · $32,500.00
-
Aug 25, 2025 · $415,000.00
-
Aug 25, 2025 · $50,000.00
-
Aug 25, 2025 · $20,000.00
-
Aug 25, 2025 · $9,600.00
-
Aug 25, 2025 · $9,600.00
-
Aug 25, 2025 · $45,000.00
-
Aug 25, 2025 · $1,728,913.83 · $1,694,335.55 · $34,578.28
-
Aug 25, 2025 · $41,324.00
-
Aug 25, 2025 · $2,163,000.00 · $2,100,000.00 · $63,000.00
-
Aug 25, 2025 · $6,000.00
-
Aug 25, 2025 · $5,752,313.29
-
Aug 25, 2025 · $23,728.96
-
Aug 25, 2025 · $13,122,000.00
-
Aug 25, 2025 · $111,615.86
-
Aug 25, 2025 · $1,633,332.22 · $1,600,665.58 · $32,666.64
-
Aug 25, 2025 · $691,977.09 · $678,137.55 · $13,839.54
-
Approve Letter of Agreement with TN Dept. of Health for HIV Surveillance/Prevention Program. $206,100
Aug 25, 2025 · $206,100.00
-
Aug 25, 2025 · $9,327,610.00
-
Aug 25, 2025 · $331,922.40
-
Aug 25, 2025 · $648,195.89
-
Aug 25, 2025 · $862,111.69 · $844,869.46 · $17,242.23
-
Aug 25, 2025 · $31,500.00
-
Jul 28, 2025 · $93,720.00
-
Jul 28, 2025 · $8,962.50
-
Jul 28, 2025 · $8,587,000.00
-
Jul 28, 2025 · $0.15 · $0.20
-
Jul 28, 2025 · $1,101,822.00
-
Jul 28, 2025 · $64,804.57 · $114,562.57
-
Jul 28, 2025 · $115,500.00
-
Jul 28, 2025 · $6,327.86
-
Jul 28, 2025 · $237,900.00
-
Jul 28, 2025 · $875.00
-
Jul 28, 2025 · $12,000.00
-
Jul 28, 2025 · $17.50
-
Jul 28, 2025 · $62,803.55
-
Jul 28, 2025 · $66,420.00
-
Jul 28, 2025 · $8,645.19
-
Jul 28, 2025 · $9,504.25
-
Jul 28, 2025 · $32,500.00
-
Jul 28, 2025 · $125,000.00
-
Jul 28, 2025 · $8,535,114.00
-
Jul 28, 2025 · $5,000.00
-
Jul 28, 2025 · $59,352.55
-
Jul 28, 2025 · $23,293.00
-
Jul 28, 2025 · $231,000.00
-
Jul 28, 2025 · $10,000.00
-
Jul 28, 2025 · $385,711.00
-
Jul 28, 2025 · $9,264.00
-
Jul 28, 2025 · $8,000.00
-
Jul 28, 2025 · $430,500.00
-
Jul 28, 2025 · $95,000.00
-
Jul 28, 2025 · $1,979,885.39
-
Jul 28, 2025 · $65,000.00
-
Jul 28, 2025 · $100,000.00
-
Jun 23, 2025 · $409,500.00
-
Jun 23, 2025 · $18,857,717.40
-
Jun 23, 2025 · $200,000.00
-
Jun 23, 2025 · $285,177.40 · $113,585.80 · $206,236.80
-
Jun 23, 2025 · $585,000.00 · $195,000.00
-
Jun 23, 2025 · $3,256,000.00
-
Jun 23, 2025 · $1,200,000.00
-
Approve Terms/Conditions/Privacy Policy with Kiddom Inc. for 6-8th grade science curriculum. $3,400,000
Jun 23, 2025 · $3,400,000.00
-
Jun 23, 2025 · $71,231.25
-
Jun 23, 2025 · $15,394,458.00 · $472,571.00
-
Jun 23, 2025 · $7,670,598.81
-
Jun 23, 2025 · $978,536.14
-
Jun 23, 2025 · $100,000.00
-
Jun 23, 2025 · $181,211.61
-
Jun 23, 2025 · $65,000.00 · $13,000.00
-
Jun 23, 2025 · $98,700.00
-
Jun 23, 2025 · $165,500.00
-
Jun 23, 2025 · $104,538.00
-
Jun 23, 2025 · $806,200.00
-
Jun 23, 2025 · $196,900.00
-
Jun 23, 2025 · $30,000 · $150,000 · $50,000 · $100,000 · $500,000 · $2,000,000 · $425,000.00
-
Jun 23, 2025 · $80,000.00
-
Jun 23, 2025 · $12.50
-
Jun 23, 2025 · $20,000 · $45,000 · $35,000 · $12,500 · $10,000 · $15,000 · $25,000 · $50,000 · $30,000 · $12,250 · $425,000 · $75,000 · $125,000 · $1,175,000 · $100,000 · $1,270,500
-
Approve 3 CDBG agreements: Knoxville-Knox Co CA C, Neighborhd Housing, UT (HMIS) (heard later). $202,000
Jun 23, 2025 · $132,000 · $50,000 · $20,000
-
Jun 23, 2025 · $132,000 · $50,000 · $20,000
-
May 19, 2025 · $130,000.00
-
May 19, 2025 · $2,874,357.00
-
May 19, 2025 · $750,000.00
-
May 19, 2025 · $1,394,649.69
-
May 19, 2025 · $114,892.64
-
May 19, 2025 · $80,000.00
-
May 19, 2025 · $5,000.00
-
May 19, 2025 · $88,986.00
-
May 19, 2025 · $2,000,000.00
-
Approve grant contract for continued operation of Knox Recovery Court & Veterans Treatment Court. $330,000
May 19, 2025 · $330,000.00
-
May 19, 2025 · $10,500.00
-
May 19, 2025 · $73,790.00 · $46,690.00 · $27,100.00
-
May 19, 2025 · $689,600.00
-
May 19, 2025 · $689,600.00
-
May 19, 2025 · $70,000.00
-
Approve consulting and license agreement with Children's Hospital Medical Center for Project SEARCH. $350
May 19, 2025 · $350.00
-
May 19, 2025 · $143,500.00
-
May 19, 2025 · $8,809,000.00
-
May 19, 2025 · $2,205,846.33
-
Apr 28, 2025 · $261,383.00
-
Apr 28, 2025 · $30,000.00
-
Apr 28, 2025 · $720,200.00
-
Approve contracts for roofing services $3,000,000
Apr 28, 2025 · $3,000,000.00
-
Apr 28, 2025 · $47,977.54
-
Apr 28, 2025 · $409,500.00
-
Apr 28, 2025 · $47,977.54
-
Apr 28, 2025 · $43,777,000.00
-
Apr 28, 2025 · $499,780.00 to Orion Planning
-
Apr 28, 2025 · $650,000.00
-
Apr 28, 2025 · $859,942.97 · $809,946.87 · $49,995.60
-
Apr 28, 2025 · $33,520.00 to Vine Middle Magnet School
-
Apr 28, 2025 · $625,000.00
-
Apr 28, 2025 · $25,860.00
-
Apr 28, 2025 · $293,785.08 · $151,343.84
-
Apr 28, 2025 · $21,000.00
-
Apr 28, 2025 · $78,072.50 · $156,145.00
-
Apr 28, 2025 · $400.00
-
Apr 28, 2025 · $15,433.00
-
Apr 28, 2025 · $369,300.00
-
Apr 28, 2025 · $150,000.00 to Avertest
-
Apr 28, 2025 · $236,000.00
-
Apr 28, 2025 · $225.00
-
Apr 28, 2025 · $47,977.54
-
Apr 28, 2025 · $1,200,000.00 · $410,000.00
-
Mar 31, 2025 · $5,000.00
-
Mar 31, 2025 · $19,300.00
-
Mar 31, 2025 · $74,776.00 · $1,024,396.00
-
Mar 31, 2025 · $271,195.00
-
Mar 31, 2025 · $168,529.00
-
Mar 31, 2025 · $373,050.00
-
Mar 31, 2025 · $36,200.00 · $36,200.00 to Greater Knoxville Chamber of Commerce
-
Mar 31, 2025 · $1,239,250.00
-
Mar 31, 2025 · $384,000.00
-
Mar 31, 2025 · $422,156.60 · $217,474.61
-
Mar 31, 2025 · $3,000.00
-
Mar 31, 2025 · $5,597.00
-
Mar 31, 2025 · $9,970,000.00
-
Mar 31, 2025 · $230,000.00
-
Mar 31, 2025 · $7,500.00
-
Mar 31, 2025 · $65,000.00
-
Mar 31, 2025 · $650,000.00
-
Mar 31, 2025 · $80,196.00
-
Feb 24, 2025 · $222,370.00
-
Feb 24, 2025 · $2,000,000.00
-
Feb 24, 2025 · $4,400.00
-
Feb 24, 2025 · $183,392.00 · $550,176.00
-
Approve amendment to grant contract with TN Dept of Health for STI prevention services. $1,039,616.92
Feb 24, 2025 · $310,517.46 · $729,099.46
-
Feb 24, 2025 · $139,650.00
-
Feb 24, 2025 · $5,000.00
-
Feb 24, 2025 · $1,755,213.10
-
Feb 24, 2025 · $645,400.00
-
Feb 24, 2025 · $6,296.00
-
Feb 24, 2025 · $248,000.00
-
Feb 24, 2025 · $23,000.00
-
Feb 24, 2025 · $776,715.00
-
Feb 24, 2025 · $14,000.00
-
Jan 27, 2025 · $615,000.00
-
Jan 27, 2025 · $75,000.00
-
Jan 27, 2025 · $114,000.00
-
Jan 27, 2025 · $1,766,730.00
-
Jan 27, 2025 · $6,750.00
-
Jan 27, 2025 · $74,000.00
-
Jan 27, 2025 · $96,624.00
-
Jan 27, 2025 · $2,000.00
-
Jan 27, 2025 · $168,904.09
-
Jan 27, 2025 · $1,100.00
-
Jan 27, 2025 · $25,000.00
-
Jan 27, 2025 · $150,000.00 · $450,000.00
-
Jan 27, 2025 · $29,640.50
-
Jan 27, 2025 · $5,000.00
-
Jan 27, 2025 · $18,000.00
-
Jan 27, 2025 · $750,000.00
-
Dec 16, 2024 · $2,768.88
-
Dec 16, 2024 · $59,700.00
-
Dec 16, 2024 · $15,330.00
-
Dec 16, 2024 · $200,000.00
-
Approve contracts for fencing services $2,000,000
Dec 16, 2024 · $2,000,000.00
-
Dec 16, 2024 · $102,465.74
-
Dec 16, 2024 · $120,000.00
-
Dec 16, 2024 · $396,674.00
-
Dec 16, 2024 · $100,000.00
-
Dec 16, 2024 · $25,000.00
-
Dec 16, 2024 · $14,264.00
-
Approve construction contract for W. Emory Road widening $2,453,198.86
Dec 16, 2024 · $2,453,198.86
-
Dec 16, 2024 · $3,150,000.00
-
Dec 16, 2024 · $278,500.00 · $768,800.00
-
Dec 16, 2024 · $14,430.00 · $72,000.00
-
Dec 16, 2024 · $144,000.00
-
Dec 16, 2024 · $4,000,000.00
-
Dec 16, 2024 · $200.00
-
Dec 16, 2024 · $5.00
-
Dec 16, 2024 · $1,000,000.00
-
Nov 18, 2024 · $279,650.00
-
Nov 18, 2024 · $96,306.00 · $3,105,625.00
-
Nov 18, 2024 · $276,484.00 to Trane U.S. Inc
-
Nov 18, 2024 · $100,000.00 · $600,000.00
-
Nov 18, 2024 · $8,684.50
-
Nov 18, 2024 · $50,000.00
-
Nov 18, 2024 · $2,026,435.86
-
Nov 18, 2024 · $11,000.00
-
Nov 18, 2024 · $548,028.75
-
Nov 18, 2024 · $50,143.72
-
Nov 18, 2024 · $1,506,250.00
-
Nov 18, 2024 · $11,347.50
-
Nov 18, 2024 · $250,000.00 · $300,000.00
-
Nov 18, 2024 · $536,789.00 · $1,783,638.00 to CSX
-
Nov 18, 2024 · $6,181.20 · $131,507.75
-
Oct 28, 2024 · $37,782.00
-
Oct 28, 2024 · $437,080.00 to Inspire Placemaking Collective
-
Oct 28, 2024 · $12,014.00
-
Oct 28, 2024 · $180,000.00
-
Oct 28, 2024 · $50,000.00
-
Oct 28, 2024 · $675,000.00 to Halls Middle School
-
Oct 28, 2024 · $188,760.00
-
Oct 28, 2024 · $2,022,158.80
-
Oct 28, 2024 · $100,000.00
-
Oct 28, 2024 · $50,000.00
-
Oct 28, 2024 · $12,500.00
-
Oct 28, 2024 · $10,005.00
-
Oct 28, 2024 · $65,000.00 to Cannon & Cannon
-
Oct 28, 2024 · $1,126,746.44 · $701,183.50
-
Oct 28, 2024 · $49,800.00
-
Oct 28, 2024 · $676,100.00
-
Oct 28, 2024 · $500,000.00 to Helen Ross McNabb Center
-
Oct 28, 2024 · $75,000.00 · $200,000.00
-
Oct 28, 2024 · $353,800.00
-
Oct 28, 2024 · $740,000.00 · $800,000.00
-
Oct 28, 2024 · $75,000.00 to Stones River Group · $6,250.00
-
Oct 28, 2024 · $972,382.32 · $108,042.48
-
Oct 28, 2024 · $30,000.00
-
Oct 28, 2024 · $115,000.00
-
Sep 23, 2024 · $100,000.00
-
Sep 23, 2024 · $20,000.00
-
Sep 23, 2024 · $10,000.00
-
Sep 23, 2024 · $550.00
-
Sep 23, 2024 · $117,000.00
-
Sep 23, 2024 · $8,000.00
-
Sep 23, 2024 · $25,000.00
-
Sep 23, 2024 · $540,800.00
-
Sep 23, 2024 · $105,207.17
-
Sep 23, 2024 · $1,278,022.49
-
Sep 23, 2024 · $509,029.67 · $498,849.08 · $10,180.59
-
Sep 23, 2024 · $782,974.01 · $767,314.53 · $15,659.48
-
Sep 23, 2024 · $436,765.60 · $428,030.29 · $8,735.31
-
Approve civil design contract with Robert G. Campbell & Associates for West Emory Road widening $186,308.30
Sep 23, 2024 · $186,308.30
-
Sep 23, 2024 · $105,696.50
-
Sep 23, 2024 · $341,096.00 · $795,892.00
-
Sep 23, 2024 · $795,892.00
-
Sep 23, 2024 · $236,615.00
-
Sep 23, 2024 · $100,241.00 · $418,582.00
-
Sep 23, 2024 · $2,000.00
-
Sep 23, 2024 · $135,000.00
-
Sep 23, 2024 · $26,200.00 · $1,228,600.00
-
Sep 23, 2024 · $97,400.00
-
Sep 23, 2024 · $80,000.00
-
Aug 26, 2024 · $150,000.00
-
Aug 26, 2024 · $39,680.00
-
Aug 26, 2024 · $399,200.00
-
Aug 26, 2024 · $893,000.00
-
Designate, commit, and appropriate funds FY24 to FY25. $11,996,497.97
Aug 26, 2024 · $11,996,497.97
-
Aug 26, 2024 · $153,000.00
-
Aug 26, 2024 · $1,375.00
-
Approve contract with Public Consulting Group for Special Education Data Management support. $130,000
Aug 26, 2024 · $130,000.00
-
Aug 26, 2024 · $250,000.00
-
Aug 26, 2024 · $2,171,811.22 · $1,210,895.99
-
Approve grant contract with TN Dept of Human Services for Pre-Employment Transition Services. $391,199
Aug 26, 2024 · $391,199.00
-
Aug 26, 2024 · $100,000.00
-
Aug 26, 2024 · $130,884.00
-
Aug 26, 2024 · $827,974.88 · $811,415.38 · $16,559.50
-
Aug 26, 2024 · $38,130.00
-
Aug 26, 2024 · $30,000.00 · $49,758.00
-
Aug 26, 2024 · $20,000.00 · $66,667.00 · $125,000.00 · $183,333.33 · $166,667.00 · $100,000.00 · $108,333.00 · $49,000.00 · $48,538.00 · $8,333.00 · $300,000.00 · $8,840.00 · $20,300.00 · $159,821.00 · $366,667.00 · $46,667.00 · $10,000.00 · $117,113.00 · $250,000.00 · $49,553.00
-
Aug 26, 2024 · $15,000.00 · $125,326.55 · $25,000.00
-
Aug 26, 2024 · $133,000.00 · $102,000.00
-
Aug 26, 2024 · $80,000.00
-
Aug 26, 2024 · $3,500.00
-
Approve grant contract with TN Dept of Health for Women, Infant and Children (WIC) Program. $9,704,400
Aug 26, 2024 · $9,704,400.00
-
Approve Amendment Two to grant contract with TN Dept of Health for immunization services. $4,724,543
Aug 26, 2024 · $351,100.00 · $4,373,443.00
-
Approve contract with TN Dept of Human Services for child care immunization record audits. $78,072.50
Aug 26, 2024 · $78,072.50
-
Aug 26, 2024 · $206,100.00
-
Aug 26, 2024 · $85,200.00
-
Aug 26, 2024 · $449,453.00
-
Aug 26, 2024 · $23,736.76
-
Aug 26, 2024 · $56,200.00
-
Approve contract with Johnson, Mirmiran, & Thompson for Halls Greenway Connector R-O-W acquisition. $33,000
Aug 26, 2024 · $33,000.00
-
Aug 26, 2024 · $962,568.39 · $10,704.18
-
Aug 26, 2024 · $66,432.00
-
Aug 26, 2024 · $66,016.91 · $68,025.79 · $970,000.00 · $349,935.00
-
Aug 26, 2024 · $277,034.63 · $122,827.74 · $205,137.63
-
Jul 22, 2024 · $1,875,000.00
-
Jul 22, 2024 · $95,905.00
-
Jul 22, 2024 · $8,962.50
-
Jul 22, 2024 · $200,000.00
-
Jul 22, 2024 · $750,000.00
-
Jul 22, 2024 · $15,414,530.00 · $472,858.00
-
Jul 22, 2024 · $12,000.00
-
Jul 22, 2024 · $10,000.00
-
Jul 22, 2024 · $4,000.00
-
Approve Commercial Lot/Land Purchase and Sale Agreement for property on Kimberlin Heights Rd. $821,925
Jul 22, 2024 · $821,925.00
-
Jul 22, 2024 · $546,800.00 · $136,700.00
-
Jul 22, 2024 · $767,000.00
-
Jul 22, 2024 · $134,375.00
-
Jul 22, 2024 · $125,000.00
-
Jul 22, 2024 · $259,500.00
-
Jul 22, 2024 · $3,481.00
-
Jul 22, 2024 · $588,576.57 · $82,397.01
-
Jul 22, 2024 · $13,750.00
-
Jun 24, 2024 · $430,500.00
-
Jun 24, 2024 · $5,000.00
-
Jun 24, 2024 · $199,190.51
-
Jun 24, 2024 · $21,407.50 · $38,168.00
-
Jun 24, 2024 · $58,093.36
-
Jun 24, 2024 · $267,500.00
-
Jun 24, 2024 · $700,000.00
-
Jun 24, 2024 · $156,900.00
-
Jun 24, 2024 · $689,600.00
-
Jun 24, 2024 · $300,000.00
-
Jun 24, 2024 · $2,756.00
-
Jun 24, 2024 · $8,600.00
-
Jun 24, 2024 · $330,000.00
-
Jun 24, 2024 · $14,950.00
-
Jun 24, 2024 · $108,062.50
-
Jun 24, 2024 · $3,110,000.00
-
Jun 24, 2024 · $500,000.00
-
Jun 24, 2024 · $500,000.00
-
Jun 24, 2024 · $1,075,000.00
-
Authorize acceptance of FY2025 Federal Education Funds. $18,926,456.46
Jun 24, 2024 · $18,926,456.46
-
Jun 24, 2024 · $7,570,075.08
-
Jun 24, 2024 · $1,089,140.59
-
Jun 24, 2024 · $943,977.75
-
Jun 24, 2024 · $222,389.91
-
Jun 24, 2024 · $2,719,102.00
-
Jun 24, 2024 · $171,400.00
-
Jun 24, 2024 · $2,755,213.10 · $4,832,049.13
-
Jun 24, 2024 · $86,900.00
-
May 20, 2024 · $2,500.00
-
May 20, 2024 · $150,000.00
-
May 20, 2024 · $1,000,000.00
-
May 20, 2024 · $454,702.61
-
May 20, 2024 · $76,800.00 · $46,600.00 · $30,200.00
-
May 20, 2024 · $75,000.00
-
May 20, 2024 · $100,000.00
-
May 20, 2024 · $79,329.00 · $3,009,319.00
-
May 20, 2024 · $236,000.00
-
May 20, 2024 · $172.00 · $120.00
-
May 20, 2024 · $9,800.00
-
May 20, 2024 · $14,861.00
-
May 20, 2024 · $200,000.00
-
May 20, 2024 · $50,000.00
-
Authorize receipt of TN Dept. of Education SSIG grant. $3,497,187.96
May 20, 2024 · $3,497,187.96
-
May 20, 2024 · $1,534,030.74
-
May 20, 2024 · $225,000.00
-
May 20, 2024 · $2,500.00
-
May 20, 2024 · $197,317.87
-
May 20, 2024 · $9,900.00
-
May 20, 2024 · $15,000.00
-
May 20, 2024 · $448,151.99
-
May 20, 2024 · $205,500.00 · $137,000.00
-
May 20, 2024 · $21,000.00
-
May 20, 2024 · $125,000.00
-
May 20, 2024 · $85,200.00
-
May 20, 2024 · $150,000.00
-
May 20, 2024 · $1,239,250.00
-
May 20, 2024 · $490,300.00
-
May 20, 2024 · $379,200.00
-
May 20, 2024 · $224,000.00
-
May 20, 2024 · $8,294,000.00
-
May 20, 2024 · $150,000.00
-
May 20, 2024 · $1,520.00
-
Apr 22, 2024 · $427,913.00
-
Apr 22, 2024 · $703,022.00
-
Apr 22, 2024 · $823,513.95
-
Apr 22, 2024 · $110,000.00
-
Apr 22, 2024 · $4,250.00
-
Apr 22, 2024 · $358,500.00
-
Apr 22, 2024 · $475,360.75
-
Apr 22, 2024 · $440,250.00
-
Apr 22, 2024 · $60,000.00
-
Apr 22, 2024 · $181,000.00
-
Apr 22, 2024 · $82,294.93
-
Apr 22, 2024 · $109,578.00
-
Apr 22, 2024 · $265,800.00
-
Apr 22, 2024 · $1,102,177.00 · $477,177.00
-
Apr 22, 2024 · $57,570.00
-
Apr 22, 2024 · $1,000.00
-
Apr 22, 2024 · $243,962.00
-
Apr 22, 2024 · $846,090.05 to US Imaging
-
Mar 25, 2024 · $600.00
-
Mar 25, 2024 · $9,000.00
-
Mar 25, 2024 · $28,725.00
-
Mar 25, 2024 · $625,000.00
-
Mar 25, 2024 · $10,000.00
-
Mar 25, 2024 · $2,394,450.00
-
Mar 25, 2024 · $18,500.00
-
Mar 25, 2024 · $19,758.00 to Sacred Ground Hospice House
-
Mar 25, 2024 · $399,712.00 · $205,912.23
-
Mar 25, 2024 · $9,517.75
-
Mar 25, 2024 · $2,629,112.00
-
Mar 25, 2024 · $3,000,000.00
-
Mar 25, 2024 · $10,000.00
-
Mar 25, 2024 · $164,066.50
-
Mar 25, 2024 · $45,000.00 to KLF · $90,000.00
-
Mar 25, 2024 · $269,775.24 · $138,975.12
-
Mar 25, 2024 · $7,101,688.00
-
Mar 25, 2024 · $250,000.00 · $100,000.00 · $150,000.00 · $420,000.00
-
Mar 25, 2024 · $99,500,000.00
-
Mar 25, 2024 · $99,500,000.00
-
Feb 26, 2024 · $15,327.62 · $15,327.62 to Hardin Valley Road
-
Approve musical agreement with Concord Theatricals for Gibbs High School's Cinderella performance. $2,100
Feb 26, 2024 · $2,100.00
-
Approve design contract with Dollar & Ewers Architecture for Halls High School stadium ADA upgrades. $5,000
Feb 26, 2024 · $5,000.00
-
Feb 26, 2024 · $191,066.08
-
Feb 26, 2024 · $1,300,000.00
-
Feb 26, 2024 · $1,467,213.79
-
Feb 26, 2024 · $32,000.00
-
Feb 26, 2024 · $183,392.00
-
Feb 26, 2024 · $28,670.00 · $470.00
-
Approve construction contract with Merit Construction for Hardin Valley Academy addition. $22,788,000
Feb 26, 2024 · $11,394,000.00 · $11,394,000.00 to Hardin Valley Academy
-
Feb 26, 2024 · $2,400,000.00
-
Feb 26, 2024 · $1,040,052.00
-
Feb 26, 2024 · $12,000,000.00
-
Feb 26, 2024 · $1,552,483.71
-
Feb 26, 2024 · $10,000.00
-
Feb 26, 2024 · $15,000 · $50,000
-
Feb 26, 2024 · $224,266.20
-
Feb 26, 2024 · $362,192.00
-
Feb 26, 2024 · $12,200.00
-
Feb 26, 2024 · $3,190.25
-
Approve amendment to grant contract for IV-D Child Support Enforcement Magistrate services. $536,488.08
Feb 26, 2024 · $7,867.91 · $346,214.22 · $4,053.17 · $178,352.78
-
Feb 26, 2024 · $65,000.00
-
Jan 26, 2024 · $500.00
-
Jan 26, 2024 · $48,175.00
-
Jan 26, 2024 · $400,000.00
-
Approve construction contract with Southern Constructors, Inc. for Huday Road bridge replacement. $524,452
Jan 26, 2024 · $524,452.00
-
Jan 26, 2024 · $20,000.00
-
Jan 26, 2024 · $2,635,241.00
-
Jan 26, 2024 · $2,343,500.00
-
Jan 26, 2024 · $1,000,000.00
-
Jan 26, 2024 · $3,150,000.00
-
Jan 26, 2024 · $104,500.00
-
Jan 26, 2024 · $36,471.25
-
Jan 26, 2024 · $150,000.00 · $150,000.00 to Knoxville Area Urban League
-
Approve agreement with InterFaith Health Center for healthcare for under/uninsured individuals. $150,000
Jan 26, 2024 · $75,000.00 · $75,000.00 to InterFaith Health Center
-
Jan 26, 2024 · $497,000.00 · $497,000.00 to McNabb Center
-
Jan 26, 2024 · $375,306.00
-
Approve OMNIA Contract #RC2002-1001 with Trane U.S. Inc. for HVAC upgrades at multiple schools. $12,829,561
Jan 26, 2024 · $12,829,561.00
-
Jan 26, 2024 · $450,000.00
-
Authorize receipt of donation from Knox Education Foundation for playground replacement. $1,087,643.93
Jan 26, 2024 · $1,087,643.93
-
Approve contract with Dr. Sharon Burnside for mental health care for incarcerated population. $178,880
Jan 26, 2024 · $89,440.00 · $89,440.00 to Dr. Sharon Burnside
-
Dec 18, 2023 · $350,000.00
-
Dec 18, 2023 · $1,000,000.00
-
Dec 18, 2023 · $417,678.00
-
Dec 18, 2023 · $303,843.54 · $312,958.85
-
Dec 18, 2023 · $8,112.00
-
Dec 18, 2023 · $100,000.00
-
Dec 18, 2023 · $100,000.00
-
Dec 18, 2023 · $40,000.00
-
Dec 18, 2023 · $1,256,814.96
-
Dec 18, 2023 · $171,000.00
-
Dec 18, 2023 · $46,348.80
-
Dec 18, 2023 · $121,751.42
-
Approve construction contract with APAC-Atlantic for Carter Schools Sidewalk Improvements $1,560,718.50
Dec 18, 2023 · $1,560,718.50
-
Dec 18, 2023 · $49,625.00
-
Dec 18, 2023 · $313,294.17 · $94,166.00
-
Dec 18, 2023 · $50,000.00
-
Dec 18, 2023 · $107,000.00 · $627,000.00
-
Dec 18, 2023 · $4,000,000.00
-
Dec 18, 2023 · $1,204,274.76
-
Nov 20, 2023 · $125,000.00
-
Nov 20, 2023 · $47,000.00
-
Nov 20, 2023 · $53,619.00 · $70,000.00 · $75,000.00 · $114,416.40 · $50,000.00 · $160,000.00
-
Nov 20, 2023 · $100,000.00
-
Nov 20, 2023 · $1,500.00
-
Nov 20, 2023 · $150,000.00 · $150,000.00 to Centro Hispano De East Tennessee
-
Nov 20, 2023 · $80,326.55 · $50,000.00
-
Nov 20, 2023 · $39,700.00
-
Nov 20, 2023 · $9,950.00
-
Nov 20, 2023 · $39,748.00
-
Nov 20, 2023 · $1,534,030.74
-
Nov 20, 2023 · $12,433.00
-
Nov 20, 2023 · $15,000.00
-
Nov 20, 2023 · $10,000.00
-
Nov 20, 2023 · $46,410.00
-
Nov 20, 2023 · $3,000.00
-
Nov 20, 2023 · $7,835.50
-
Nov 20, 2023 · $313,990.00
-
Nov 20, 2023 · $233,700.00
-
Nov 20, 2023 · $45,000.00 · $9,000.00
-
Oct 23, 2023 · $541,360.00
-
Oct 23, 2023 · $200,000.00
-
Oct 23, 2023 · $6,500.00
-
Oct 23, 2023 · $75,000.00 · $6,250.00
-
Oct 23, 2023 · $226,900.00
-
Oct 23, 2023 · $200,000.00
-
Oct 23, 2023 · $120,000.00
-
Oct 23, 2023 · $200,000.00
-
Approve contract for paving services $2,500,000
Oct 23, 2023 · $2,500,000.00
-
Approve purchase of 41 acres in Farragut $4,892,500
Oct 23, 2023 · $4,892,500.00
-
Accept Title IV Stronger Connections Grant $1,105,338.94
Oct 23, 2023 · $1,105,338.94
-
Oct 23, 2023 · $2,405,031.18
-
Oct 23, 2023 · $1,520,400.00
-
Oct 23, 2023 · $108,142.00
-
Oct 23, 2023 · $1,500,000.00 · $200,000.00
-
Oct 23, 2023 · $7,582.69
-
Oct 23, 2023 · $14,930.00
-
Oct 23, 2023 · $111,752.50
-
Oct 23, 2023 · $789,036.00
-
Oct 23, 2023 · $265,800.00
-
Oct 23, 2023 · $36,471.25
-
Oct 23, 2023 · $911,354.00
-
Oct 23, 2023 · $17,570.00
-
Oct 23, 2023 · $401,200.00 · $2,076,836.03
-
Oct 23, 2023 · $32,000.00 · $4,149,000.00
-
Oct 23, 2023 · $150,000.00 · $750,000.00
-
Oct 23, 2023 · $8,775.00 · $61,010.00 · $64,670.60 · $68,550.84
-
Oct 23, 2023 · $8,000.00
-
Oct 23, 2023 · $8,000.00
-
Oct 23, 2023 · $8,000.00
-
Oct 23, 2023 · $8,000.00
-
Oct 23, 2023 · $8,000.00
-
Oct 23, 2023 · $1,500,000.00 · $200,000.00
-
Sep 25, 2023 · $104,806.37
-
Sep 25, 2023 · $1,700.00
-
Sep 25, 2023 · $1,800.00
-
Sep 25, 2023 · $909.00
-
Sep 25, 2023 · $214,000.00
-
Sep 25, 2023 · $35,000.00
-
Sep 25, 2023 · $20,000.00 · $10,000
-
Sep 25, 2023 · $217,106.59
-
Sep 25, 2023 · $10,000.00 · $175,000.00 · $44,500.00
-
Sep 25, 2023 · $650,000.00 · $200,000.00
-
Sep 25, 2023 · $1,320,505.00
-
Sep 25, 2023 · $1,202,400.00
-
Sep 25, 2023 · $206,100.00
-
Sep 25, 2023 · $510,200.00
-
Sep 25, 2023 · $213,000.00
-
Sep 25, 2023 · $40,000,000.00
-
Sep 25, 2023 · $1,091,600.00
-
Sep 25, 2023 · $58,500.00
-
Sep 25, 2023 · $94,970.00
-
Aug 28, 2023 · $4,310.00
-
Aug 28, 2023 · $14,000.00
-
Aug 28, 2023 · $2,500,000.00
-
Aug 28, 2023 · $15,000.00
-
Aug 28, 2023 · $25,960.00
-
Aug 28, 2023 · $144,000.00
-
Aug 28, 2023 · $8,600.00
-
Aug 28, 2023 · $923,450.00
-
Aug 28, 2023 · $1,372,500.00
-
Approve increase to design contract with Thomas Caldwell for Gibbs High School stadium project $30,000
Aug 28, 2023 · $30,000.00
-
Aug 28, 2023 · $120,000.00
-
Aug 28, 2023 · $108,000.00
-
Aug 28, 2023 · $42,000.00
-
Aug 28, 2023 · $20,000,000.00
-
Aug 28, 2023 · $10,000.00
-
Aug 28, 2023 · $9,600.00
-
Aug 28, 2023 · $41,446.98
-
Aug 28, 2023 · $25,000.00
-
Aug 28, 2023 · $45,246.00
-
Aug 28, 2023 · $949,620.00
-
Aug 28, 2023 · $987,500.00
-
Aug 28, 2023 · $66,395.00
-
Aug 28, 2023 · $99,800.00
-
Aug 28, 2023 · $82,575.00
-
Aug 28, 2023 · $300,000.00 · $100,000.00 · $20,000.00 · $15,000.00
-
Designate/commit and appropriate funds from FY23 to FY24 $9,707,932.10
Aug 28, 2023 · $9,707,932.10
-
Jul 24, 2023 · $202,880.00
-
Jul 24, 2023 · $430,500.00
-
Jul 24, 2023 · $130,000.00
-
Accept FY2024 Federal Title funds from TN Dept. of Education $18,902,121.50
Jul 24, 2023 · $18,902,121.50
-
Jul 24, 2023 · $2,231,076.40 · $1,152,000.00
-
Jul 24, 2023 · $400,000.00
-
Jul 24, 2023 · $928,168.71
-
Jul 24, 2023 · $6,000.00
-
Approve HazMat grant for fire training $16,760.50
Jul 24, 2023 · $16,760.50
-
Jul 24, 2023 · $639,800.00
-
Jul 24, 2023 · $750,000.00 · $500.00
-
Jul 24, 2023 · $965,250.00
-
Jul 24, 2023 · $51,087.20
-
Jul 24, 2023 · $78,072.51
-
Jun 26, 2023 · $5,993,376.28 · $1,087,033.93
-
Jun 26, 2023 · $825,000.00
-
Jun 26, 2023 · $10,000.00
-
Jun 26, 2023 · $203,500.00
-
Jun 26, 2023 · $8,962.00
-
Jun 26, 2023 · $1,725.00
-
Jun 26, 2023 · $11,425.00
-
Jun 26, 2023 · $1,200,000.00
-
Approve contracts for plumbing services. $1,500,000
Jun 26, 2023 · $1,500,000.00
-
Jun 26, 2023 · $1,653,000.00
-
Jun 26, 2023 · $96,621.54
-
Jun 26, 2023 · $263,750.00
-
Jun 26, 2023 · $299,995.00
-
Jun 26, 2023 · $26.09
-
Jun 26, 2023 · $17,200.00
-
Jun 26, 2023 · $1,900.00
-
Jun 26, 2023 · $1,600.00
-
Jun 26, 2023 · $1,000.00
-
Jun 26, 2023 · $316,250.00
-
Jun 26, 2023 · $236,000.00
-
Jun 26, 2023 · $347,900.00
-
Jun 26, 2023 · $14,674,486.00 · $448,043.00
-
Jun 26, 2023 · $416,250.00
-
Jun 26, 2023 · $82,150.00
-
Jun 26, 2023 · $50,000.00
-
Jun 5, 2023 · $7,437,750.00
-
May 22, 2023 · $500.00
-
May 22, 2023 · $335,200.00 · $4,022,343.00
-
May 22, 2023 · $70,000,000
-
May 22, 2023 · $42,440.00 · $60,000.00
-
May 22, 2023 · $2,625.00
-
May 22, 2023 · $1,000.00
-
May 22, 2023 · $8,500.00
-
May 22, 2023 · $200.00
-
May 22, 2023 · $180,000.00
-
May 22, 2023 · $265,000.00
-
May 22, 2023 · $225,000.00
-
May 22, 2023 · $4,478,590.00
-
May 22, 2023 · $12,000.00
-
May 22, 2023 · $499,812.00
-
May 22, 2023 · $149,298.07
-
May 22, 2023 · $211,735.00 · $642,235.00
-
May 22, 2023 · $254,492.21 · $131,102.04
-
May 22, 2023 · $600,000.00
-
May 22, 2023 · $39,010.00 · $18,255.00 · $2,500.00
-
May 22, 2023 · $76,800.00 · $46,600.00 · $30,200.00
-
May 22, 2023 · $710,153.00
-
May 22, 2023 · $537,949.17
-
May 22, 2023 · $15,166,601.01 · $10,060,000 · $5,145,000 · $12,575,000 · $1,885,000 · $2,890,000
-
May 22, 2023 · $750,000.00
-
May 22, 2023 · $200,000.00
-
May 22, 2023 · $420,000.00
-
May 22, 2023 · $689,600.00
-
May 22, 2023 · $80,000,000
-
May 22, 2023 · $338,346.31 · $174,299.61
-
Apr 24, 2023 · $138,145.47
-
Apr 24, 2023 · $143,895.47
-
Apr 24, 2023 · $3,500.00
-
Apr 24, 2023 · $89,626.00
-
Apr 24, 2023 · $250.00
-
Apr 24, 2023 · $835,032.00
-
Apr 24, 2023 · $1,102,177.00 · $477,177.00
-
Apr 24, 2023 · $5,934.00
-
Apr 24, 2023 · $1,521,500.00
-
Apr 24, 2023 · $112,062.69 · $112,062.69 to The Christman Company
-
Apr 24, 2023 · $815,000.00
-
Apr 24, 2023 · $11,134.00
-
Apr 24, 2023 · $575,361.90
-
Apr 24, 2023 · $171,400.00
-
Apr 24, 2023 · $406,456.60
-
Apr 24, 2023 · $16,000.00
-
Apr 24, 2023 · $4,000.00
-
Apr 24, 2023 · $233,333.00
-
Mar 27, 2023 · $875.00
-
Mar 27, 2023 · $4,623.00
-
Mar 27, 2023 · $9,480.75
-
Mar 27, 2023 · $1,732,000.00
-
Mar 27, 2023 · $750,000.00
-
Mar 27, 2023 · $750,000.00
-
Mar 27, 2023 · $65,000.00
-
Mar 27, 2023 · $1,597,669.01
-
Mar 27, 2023 · $671,205.00
-
Mar 27, 2023 · $28,887.57
-
Mar 27, 2023 · $15,000.00
-
Mar 27, 2023 · $200,000.00
-
Mar 27, 2023 · $20,270.92
-
Mar 27, 2023 · $930,000.00
-
Mar 27, 2023 · $145,500.00
-
Mar 27, 2023 · $37,270.00
-
Mar 27, 2023 · $1,520,313.25 · $1,489,906.99 · $30,406.27
-
Mar 27, 2023 · $12,000.00
-
Mar 27, 2023 · $188,800.00
-
Mar 27, 2023 · $1,555,950.00
-
Mar 27, 2023 · $387,403.80
-
Mar 27, 2023 · $1,060,950.00
-
Mar 27, 2023 · $4,976.00 · $147,554.00
-
Mar 27, 2023 · $1,600.00
-
Mar 27, 2023 · $1,600.00
-
Mar 27, 2023 · $2,157.38
-
Mar 27, 2023 · $183,392.00
-
Mar 27, 2023 · $930,000.00
-
Feb 21, 2023 · $33,663.00
-
Feb 21, 2023 · $400,000.00 · $400,000.00 to Little Vols Learning Center
-
Feb 21, 2023 · $52,495.00
-
Feb 21, 2023 · $27,500.00
-
Feb 21, 2023 · $23,985.00
-
Feb 21, 2023 · $152,725.74
-
Feb 21, 2023 · $1,700.00
-
Feb 21, 2023 · $1,630.00
-
Feb 21, 2023 · $1,522,200.00
-
Feb 21, 2023 · $23,500,000.00
-
Feb 21, 2023 · $10,000.00
-
Feb 21, 2023 · $7,500,000.00
-
Feb 21, 2023 · $217,532.36
-
Feb 21, 2023 · $209,985.33
-
Feb 21, 2023 · $95,000.00
-
Feb 21, 2023 · $9,959.00
-
Feb 21, 2023 · $455,839.00
-
Feb 21, 2023 · $363,377.50
-
Feb 21, 2023 · $126,400.00
-
Feb 21, 2023 · $1,900.00
-
Jan 23, 2023 · $1,000.00 · $5,000.00
-
Jan 23, 2023 · $786,200.00 to Modern Day Wrecking
-
Jan 23, 2023 · $3,400.00
-
Jan 23, 2023 · $215,600.00
-
Jan 23, 2023 · $37.00
-
Jan 23, 2023 · $10,000.00
-
Jan 23, 2023 · $1,040,000.00
-
Jan 23, 2023 · $150,000.00
-
Jan 23, 2023 · $403,000.00
-
Jan 23, 2023 · $414,740.00
-
Jan 23, 2023 · $2,757,300.00
-
Jan 23, 2023 · $95,158.00
-
Jan 23, 2023 · $2,500.00
-
Jan 23, 2023 · $1,941.00
-
Jan 23, 2023 · $4,412.00
-
Jan 23, 2023 · $138,118.80
-
Jan 23, 2023 · $10,000.00
-
Jan 23, 2023 · $12,878.09
-
Jan 23, 2023 · $317,500.00
-
Jan 23, 2023 · $1,300,000.00
-
Jan 23, 2023 · $48,000.00
-
Jan 23, 2023 · $100,000.00
-
Dec 19, 2022 · $15,000.00
-
Dec 19, 2022 · $9,500.00
-
Dec 19, 2022 · $1,000.00
-
Dec 19, 2022 · $42,000.00
-
Dec 19, 2022 · $1,835,000.00
-
Dec 19, 2022 · $500,000.00 · $23,800,000.00
-
Dec 19, 2022 · $493,677.00 · $164,559.40
-
Accept TN Dept of Education Turnaround Action Grant for Sarah Moore Greene Magnet Academy $274,903.45
Dec 19, 2022 · $274,903.45
-
Dec 19, 2022 · $100,000.00
-
Dec 19, 2022 · $120,000.00
-
Dec 19, 2022 · $106,393.19
-
Dec 19, 2022 · $5,000.00
-
Dec 19, 2022 · $10,000.00
-
Dec 19, 2022 · $50,000.00
-
Dec 19, 2022 · $40,000.00
-
Dec 19, 2022 · $416,440.00
-
Approve Line-Item Transfers totaling $204,736.12 $204,736.12
Dec 19, 2022 · $204,736.12
-
Dec 19, 2022 · $39,500.00
-
Dec 19, 2022 · $17,839.00
-
Nov 21, 2022 · $300,000.00
-
Accept TN Dept. of Education Safe Schools Grant ($1.6M) $2,104,693.61
Nov 21, 2022 · $1,621,363.61 · $483,330.00
-
Nov 21, 2022 · $815.00
-
Nov 21, 2022 · $117,000.00
-
Nov 21, 2022 · $379,000.00
-
Nov 21, 2022 · $339,357.82
-
Nov 21, 2022 · $163,062.41
-
Nov 21, 2022 · $319,224.87
-
Nov 21, 2022 · $135,753.31
-
Nov 21, 2022 · $15,000.00
-
Nov 21, 2022 · $10,000.00
-
Nov 21, 2022 · $6,250.00
-
Nov 21, 2022 · $538,850.00
-
Nov 21, 2022 · $108,800.00
-
Nov 21, 2022 · $967,609.83
-
Nov 21, 2022 · $130,000.00
-
Nov 21, 2022 · $15,841,489.56
-
Nov 21, 2022 · $44,525.00
-
Nov 21, 2022 · $1,771,227.00
-
Nov 21, 2022 · $48,700.00
-
Nov 21, 2022 · $35,000.00
-
Oct 24, 2022 · $2,066,544.75
-
Oct 24, 2022 · $531,960.00
-
Oct 24, 2022 · $15,000.00
-
Oct 24, 2022 · $100,226.50
-
Oct 24, 2022 · $68,820.00
-
Oct 24, 2022 · $197,000.00
-
Oct 24, 2022 · $2,350.00
-
Oct 24, 2022 · $62,100.00
-
Oct 24, 2022 · $90,069.86 · $250,000.00
-
Oct 24, 2022 · $9,959.00
-
Oct 24, 2022 · $175,500.00 · $205,500.00
-
Oct 24, 2022 · $200,000.00 · $265,000.00
-
Oct 24, 2022 · $15,000.00
-
Oct 24, 2022 · $2,000,000.00
-
Oct 24, 2022 · $75,000.00 to Stones River Group · $6,250.00
-
Sep 26, 2022 · $9,431.00 · $9,431.00 to November
-
Sep 26, 2022 · $1,180,000.00 · $1,180,000.00 to The Lewis Group Architects
-
Sep 26, 2022 · $519,711.00
-
Sep 26, 2022 · $350,000.00
-
Sep 26, 2022 · $600.00
-
Sep 26, 2022 · $200,000.00
-
Sep 26, 2022 · $732,000.00 · $732,000.00 to Cope Associates
-
Approve grant contract with TN Dept. of Human Services for Pre-Employment Transition Services. $552,294.75
Sep 26, 2022 · $368,196.50 · $184,098.25
-
Sep 26, 2022 · $30,000.00
-
Sep 26, 2022 · $25,321.00
-
Sep 26, 2022 · $931,250.00
-
Sep 26, 2022 · $10,000.00
-
Sep 26, 2022 · $42,949.00
-
Sep 26, 2022 · $43,845.50
-
Sep 26, 2022 · $215,000.00
-
Sep 26, 2022 · $443,926.64
-
Sep 26, 2022 · $60,396.36
-
Sep 26, 2022 · $86,549.36
-
Sep 26, 2022 · $276,342.50
-
Sep 26, 2022 · $520,000.00 · $260,000.00
-
Sep 26, 2022 · $21,000.00
-
Sep 26, 2022 · $25,950.00
-
Sep 26, 2022 · $1,075,000.00
-
Aug 22, 2022 · $300,266.00
-
Aug 22, 2022 · $16,000.00
-
Aug 22, 2022 · $25,000.00 · $12,500.00
-
Aug 22, 2022 · $29,000.00
-
Aug 22, 2022 · $140,000
-
Aug 22, 2022 · $11,000.00
-
Aug 22, 2022 · $14,980.00
-
Aug 22, 2022 · $14,675.00
-
Aug 22, 2022 · $813,833.00
-
Aug 22, 2022 · $216,178.00
-
Aug 22, 2022 · $178,000.00
-
Aug 22, 2022 · $122,816.00
-
Aug 22, 2022 · $100,000.00
-
Aug 22, 2022 · $1,128,874.76
-
Aug 22, 2022 · $7,100.00
-
Aug 22, 2022 · $6,000.00
-
Aug 22, 2022 · $2,400.00
-
Aug 22, 2022 · $220,000.00 to Knox County
-
Aug 22, 2022 · $3,206,160.50 to Whaley Construction
-
Aug 22, 2022 · $38,700.00
-
Aug 22, 2022 · $230,000 · $650,000 · $60,000 to Sacred Ground Hospice House
-
Aug 22, 2022 · $2,242,690.40 · $1,152,026.60
-
Aug 22, 2022 · $425,000 · $35,000 · $75,000 · $9,500 · $30,000 · $15,000 · $45,000 · $22,250 · $10,000 · $100,000 · $20,000 · $56,000 · $1,270,500 · $125,000 · $50,000 · $475,000
-
Aug 22, 2022 · $120,000 · $10,000 · $60,000 · $15,000 · $17,280
-
Aug 22, 2022 · $325,000 · $100,000 · $50,000 · $250,000 · $15,000 · $550,000 · $200,000 · $75,000 · $150,000 · $170,000 · $4,000,000 to Zoo Knoxville
-
Aug 22, 2022 · $400,000.00
-
Aug 22, 2022 · $156,900.00
-
Aug 22, 2022 · $51,279.00
-
Aug 22, 2022 · $63,028.00
-
Aug 22, 2022 · $66,720.00
-
Aug 22, 2022 · $7,628,071.85
-
Jun 27, 2022 · $2,670.00
-
Jun 27, 2022 · $35,597.00 to CSX Transportation
-
Jun 27, 2022 · $13,670.08
-
Jun 27, 2022 · $1,561.00
-
Jun 27, 2022 · $3,775.00 to West High School
-
Jun 27, 2022 · $200,000.00
-
Jun 27, 2022 · $750,000.00
-
Jun 27, 2022 · $100,000.00
-
Jun 27, 2022 · $200,000.00
-
Approve contract for body-worn cameras. $205,293.75
Jun 27, 2022 · $205,293.75
-
Jun 27, 2022 · $410,000.00
-
Jun 27, 2022 · $13,901,835.00 · $422,489.00
-
Jun 27, 2022 · $60,000.00
-
Jun 27, 2022 · $55,160.00
-
Jun 27, 2022 · $79,975.00
-
Jun 27, 2022 · $37,650.00
-
Jun 27, 2022 · $150,000.00 to Volunteer Ministry Center
-
Jun 27, 2022 · $2,929,990.00 · $585,998.00
-
Jun 27, 2022 · $360,800.00
-
Jun 27, 2022 · $32,500.00
-
Jun 27, 2022 · $136,550.00
-
Jun 27, 2022 · $159,302.00
-
Jun 27, 2022 · $85,000.00
-
Jun 27, 2022 · $534,350.00
-
Jun 27, 2022 · $500,000.00
-
Jun 27, 2022 · $183,392.00
-
Jun 27, 2022 · $928,168.71
-
Jun 27, 2022 · $10,000.00
-
Jun 27, 2022 · $75,000.00 to Volunteer Ministry Center
-
May 23, 2022 · $200,000.00
-
May 23, 2022 · $650,000.00
-
May 23, 2022 · $83,000.00 · $49,800.00 · $33,200.00
-
May 23, 2022 · $68,800.00
-
May 23, 2022 · $1,450.00
-
May 23, 2022 · $1,200.00
-
May 23, 2022 · $12,500.00
-
May 23, 2022 · $100,000.00
-
May 23, 2022 · $93,800.00
-
May 23, 2022 · $350,000
-
May 23, 2022 · $400,000.00
-
May 23, 2022 · $100,000.00
-
May 23, 2022 · $82,150.00
-
May 23, 2022 · $567,850.00
-
May 23, 2022 · $960,000.00
-
May 23, 2022 · $611,430.00
-
May 23, 2022 · $212,000.00
-
May 23, 2022 · $115,000.00
-
May 23, 2022 · $118,400.00
-
May 23, 2022 · $31,257.00
-
May 23, 2022 · $1,600.00
-
May 23, 2022 · $7,404,300.00
-
Authorize acceptance of federal funding for FY2023. $19,576,555.99
May 23, 2022 · $19,576,555.99
-
May 23, 2022 · $410,000.00
-
May 23, 2022 · $16,179.96
-
May 23, 2022 · $100,000.00 · $175,000.00
-
May 23, 2022 · $75,000.00
-
May 23, 2022 · $5,090.00
-
May 23, 2022 · $275,000.00
-
May 23, 2022 · $70,128.22
-
Apr 25, 2022 · $14,160,000.00
-
Apr 25, 2022 · $4,081,611.00 to Joseph Construction Co
-
Apr 25, 2022 · $10,000.00
-
Apr 25, 2022 · $45,000.00
-
Apr 25, 2022 · $150,000.00 to The Mend House
-
Apr 25, 2022 · $50,033.82
-
Apr 25, 2022 · $1,291,500.00 · $4,428,000.00
-
Accept ATSI Grant for three schools. $300,000
Apr 25, 2022 · $225,000.00 · $75,000.00
-
Apr 25, 2022 · $224,200.00 to ByWater Solutions
-
Accept ERA1 reallocated funds. $15,570,984
Apr 25, 2022 · $15,570,984.00
-
Apr 25, 2022 · $708,900.00
-
Apr 25, 2022 · $4,117,000.00 · $823,400.00
-
Apr 25, 2022 · $500.00
-
Apr 25, 2022 · $40,000.00
-
Apr 25, 2022 · $500,000.00
-
Apr 25, 2022 · $235,917.01 · $121,533.02
-
Apr 25, 2022 · $171,400.00
-
Apr 25, 2022 · $1,190,755.00 · $429,713.00
-
Apr 25, 2022 · $97,500.00
-
Apr 25, 2022 · $5,700.00
-
Mar 28, 2022 · $1,309,800.00 to Henley Roofing Company
-
Mar 28, 2022 · $34,054.60 to Gresham Smith
-
Mar 28, 2022 · $1,259,708.70 to APAC-Atlantic
-
Mar 28, 2022 · $206,500.00 · $9,500.00
-
Mar 28, 2022 · $400.00
-
Mar 28, 2022 · $9,600.00
-
Mar 28, 2022 · $440,000.00
-
Mar 28, 2022 · $66,731.00
-
Mar 28, 2022 · $240,000.00
-
Mar 28, 2022 · $121,000.00
-
Mar 28, 2022 · $98,314.00
-
Mar 28, 2022 · $20,757,611.06
-
Mar 28, 2022 · $126,400.00
-
Mar 28, 2022 · $930,666.00
-
Mar 28, 2022 · $225,000.00 · $10,000.00 · $5,000.00
-
Mar 28, 2022 · $1,025.00
-
Mar 28, 2022 · $78,000.00
-
Mar 28, 2022 · $950,000.00 · $50,000.00
-
Mar 28, 2022 · $324,588.00 · $167,212.00
-
Jan 24, 2022 · $65,590.11
-
Jan 24, 2022 · $22,500.00
-
Jan 24, 2022 · $200,000.00
-
Jan 24, 2022 · $400,000.00 · $400,000.00 to Lincoln Park Center
-
Jan 24, 2022 · $1,613,090.00
-
Jan 24, 2022 · $38,000.00
-
Jan 24, 2022 · $1,250,000.00
-
Jan 24, 2022 · $10,000.00
-
Jan 24, 2022 · $50,000.00
-
Jan 24, 2022 · $7,055,000.00
-
Jan 24, 2022 · $5,886.25
-
Jan 24, 2022 · $10,700.00 · $600.00
-
Jan 24, 2022 · $501,200.00
-
Jan 24, 2022 · $37,500.00
-
Jan 24, 2022 · $685,535.00
-
Jan 24, 2022 · $150,000.00
-
Jan 24, 2022 · $1,000,000.00 · $1,000,000.00 to Knoxville Habitat
-
Jan 24, 2022 · $966,200.00
-
Dec 20, 2021 · $3,500,000.00 to Zoo Knoxville
-
Dec 20, 2021 · $1,600.00
-
Dec 20, 2021 · $448,779.00
-
Dec 20, 2021 · $48,328.00 · $12,081.00
-
Dec 20, 2021 · $95,000.00
-
Dec 20, 2021 · $828,768.50
-
Dec 20, 2021 · $50,000.00 · $100,000.00
-
Dec 20, 2021 · $3,261,883.00
-
Dec 20, 2021 · $203,700.00
-
Dec 20, 2021 · $150,000.00
-
Dec 20, 2021 · $1,600.00
-
Dec 20, 2021 · $145,800.00 · $12,150.00
-
Dec 20, 2021 · $6,000.00 · $500.00
-
Dec 20, 2021 · $37.00
-
Dec 20, 2021 · $8,981.96 to November
-
Dec 20, 2021 · $100,000.00
-
Dec 20, 2021 · $1,249,500.00
-
Dec 20, 2021 · $113,395.77
-
Nov 15, 2021 · $500,000.00
-
Nov 15, 2021 · $85,200.07
-
Nov 15, 2021 · $52,700.00
-
Nov 15, 2021 · $58,981.00
-
Nov 15, 2021 · $25,000.00
-
Nov 15, 2021 · $5,000.00
-
Nov 15, 2021 · $15,000.00
-
Nov 15, 2021 · $10,000.00
-
Nov 15, 2021 · $19,720.00
-
Nov 15, 2021 · $47,025.00
-
Nov 15, 2021 · $416 · $832
-
Nov 15, 2021 · $392,453.00
-
Nov 15, 2021 · $46,595.00
-
Nov 15, 2021 · $58,832.81
-
Nov 15, 2021 · $100,000.00
-
Accept Safe Schools Grant award and matching funds $1,781,372.31
Nov 15, 2021 · $1,306,422.31 · $474,950.00
-
Nov 15, 2021 · $5,000.00 · $25,000.00
-
Oct 25, 2021 · $520,308.25
-
Oct 25, 2021 · $26,914 · $400,000 · $38,000
-
Oct 25, 2021 · $220,544.00
-
Oct 25, 2021 · $66,000.00 · $5,500.00
-
Oct 25, 2021 · $1,181,062.00
-
Oct 25, 2021 · $2,900.00
-
Oct 25, 2021 · $124,000.00
-
Oct 25, 2021 · $85,800.00
-
Accept ARP IDEA and ARP IDEA Preschool grants for FY2022 $3,722,249.30
Oct 25, 2021 · $3,489,598.65 · $232,650.65
-
Oct 25, 2021 · $150,000.00
-
Oct 25, 2021 · $92,698.58
-
Oct 25, 2021 · $412,593.04
-
Oct 25, 2021 · $2,000.00
-
Oct 25, 2021 · $100,128.70
-
Oct 25, 2021 · $250.00 · $3,000.00
-
Sep 27, 2021 · $1,107,216.24
-
Sep 27, 2021 · $43,200.00
-
Sep 27, 2021 · $2,090,000.00
-
Sep 27, 2021 · $261,000.00
-
Sep 27, 2021 · $163,213.00
-
Sep 27, 2021 · $2,000,000.00
-
Sep 27, 2021 · $72,600.00
-
Sep 27, 2021 · $6,764,400.00 · $2,254,800.00
-
Sep 27, 2021 · $61,314.83
-
Sep 27, 2021 · $3,000.00
-
Sep 27, 2021 · $163,780.04
-
Sep 27, 2021 · $463,211.94
-
Sep 27, 2021 · $98,000.00
-
Sep 27, 2021 · $16,779,069.02
-
Sep 27, 2021 · $20,000.00
-
Sep 27, 2021 · $1,510,426.20 · $755,213.10
-
Approve grant contract with TN Dept. of Mental Health for COAP Overdose Fatality Review Team. $79,550
Sep 27, 2021 · $79,550.00
-
Sep 27, 2021 · $259,200.00
-
Approve agreement with Path Construction Northeast, Inc. for Gibbs High School Stadium Project. $3,206,000
Sep 27, 2021 · $3,206,000.00
-
Sep 27, 2021 · $1,183,213.82
-
Aug 23, 2021 · $120,000.00
-
Aug 23, 2021 · $10,000.00
-
Aug 23, 2021 · $8,500.00
-
Aug 23, 2021 · $127,590.00
-
Aug 23, 2021 · $94,000.00
-
Aug 23, 2021 · $50,000.00
-
Aug 23, 2021 · $17,783.00
-
Aug 23, 2021 · $10,000.00
-
Aug 23, 2021 · $9,960.00
-
Aug 23, 2021 · $625,000.00 · $125,000.00
-
Aug 23, 2021 · $29,400.00
-
Aug 23, 2021 · $23,003.36
-
Aug 23, 2021 · $500.00
-
Aug 23, 2021 · $561,009.94
-
Aug 23, 2021 · $500,000.00
-
Aug 23, 2021 · $100,000.00
-
Aug 23, 2021 · $6,000.00
-
Aug 23, 2021 · $131,950.00
-
Aug 23, 2021 · $4,245.00
-
Aug 23, 2021 · $50,900.00
-
Aug 23, 2021 · $360,800.00
-
Designate/appropriate funds from FY21 to FY22. $9,835,564.43
Aug 23, 2021 · $9,835,564.43
-
Aug 23, 2021 · $1,086,000.00
-
Jul 26, 2021 · $105,880.00
-
Jul 26, 2021 · $137,000.00 to LDA Engineering
-
Jul 26, 2021 · $83,000.00 · $49,800.00 · $33,200.00
-
Jul 26, 2021 · $200,000.00 to Legal Aid of East Tennessee
-
Jul 26, 2021 · $48,755.00
-
Jul 26, 2021 · $25.00
-
Jul 26, 2021 · $2,776,733.50
-
Jul 26, 2021 · $185,000.00 · $15,000.00
-
Jul 26, 2021 · $115,267.50
-
Jul 26, 2021 · $600,000.00
-
Jul 26, 2021 · $525,051.00
-
Jul 26, 2021 · $5,000.00
-
Jul 26, 2021 · $24,220,250.00
-
Jul 26, 2021 · $675,745.00
-
Jul 26, 2021 · $706,500.00
-
Jul 26, 2021 · $10,000.00
-
Jul 26, 2021 · $415,000.00 · $83,000.00
-
Jul 26, 2021 · $85,000.00
-
Jun 28, 2021 · $18,000.00
-
Jun 28, 2021 · $477,052.00 · $238,536.00
-
Jun 28, 2021 · $1,190,755.00 · $1,173,463 · $267,292.00 · $250,000.00
-
Jun 28, 2021 · $50,000.00 to Neighborhood Housing
-
Jun 28, 2021 · $176,000.00 · $120,000 · $15,000 · $10,000 · $16,000
-
Jun 28, 2021 · $3,500.00
-
Jun 28, 2021 · $1,940.30
-
Jun 28, 2021 · $50,000.00
-
Jun 28, 2021 · $28,693.00
-
Accept Voluntary Pre-K Grant from TN Dept. of Education. $2,773,532.20
Jun 28, 2021 · $2,087,532.20 · $686,000.00
-
Jun 28, 2021 · $800,000.00 · $400,000 · $400,000 to Knox County
-
Jun 28, 2021 · $1,482,927.00 to Stansell Electric Company
-
Jun 28, 2021 · $267,292.00
-
Jun 28, 2021 · $91,240.00 to Homesource East Tennessee
-
Jun 28, 2021 · $50,000.00 to SEEED
-
Jun 28, 2021 · $165,389.00
-
Jun 28, 2021 · $156,900.00
-
Jun 28, 2021 · $10,000,000.00
-
Jun 28, 2021 · $2,500.00 to Knox County
-
Jun 28, 2021 · $150,000.00
-
Jun 28, 2021 · $255,000.00
-
Jun 28, 2021 · $250.00
-
Accept Learning Camps Grant from TN Dept. of Education. $7,057,734.56
Jun 28, 2021 · $7,057,734.56
-
Jun 28, 2021 · $939,278.15
-
Jun 28, 2021 · $35,714.00
-
Jun 28, 2021 · $743,425.00 · $16,200.00
-
Jun 28, 2021 · $287,100.00
-
Jun 28, 2021 · $100,000.00
-
Jun 28, 2021 · $249,150.00 to CDM Smith
-
Accept Treasury Emergency Rental Assistance 2 award. $4,479,416.24
Jun 28, 2021 · $4,479,416.24
-
Jun 28, 2021 · $16,000.00
-
Jun 28, 2021 · $525,000.00 to McNabb Center
-
Jun 28, 2021 · $75,000.00
-
Jun 28, 2021 · $349,185.00
-
May 24, 2021 · $6,471,750.00
-
Apr 26, 2021 · $8,000.00 · $2,931,592.00
-
Apr 26, 2021 · $8,850.00
-
Apr 26, 2021 · $49,655.00
-
Apr 26, 2021 · $1,490.00
-
Apr 26, 2021 · $60,000.00
-
Approve 2nd amendment to Contract 20-314 with Rouse Construction for Lonsdale Elementary $19,950,000
Apr 26, 2021 · $19,950,000.00
-
Apr 26, 2021 · $1,305,000.00
-
Apr 26, 2021 · $78,500.00
-
Apr 26, 2021 · $250,000.00
-
Apr 26, 2021 · $3,200.00
-
Apr 26, 2021 · $1,074,055.06
-
Apr 26, 2021 · $168,700.00
-
Apr 26, 2021 · $1,173,463.00 · $429,713.00
-
Apr 26, 2021 · $100,000.00
-
Apr 26, 2021 · $1,058,642.00 · $100,000 · $200,000 · $120,000
-
Apr 26, 2021 · $708,900.00
-
Apr 26, 2021 · $156,000.00 · $7,800.00 · $163,800.00
-
Apr 26, 2021 · $1,796,063.07
-
Apr 26, 2021 · $578,600.00
-
Apr 26, 2021 · $183,392.00
-
Apr 26, 2021 · $306,475.38 · $157,881.26
-
Mar 29, 2021 · $68,340.00 · $205,000
-
Mar 29, 2021 · $15,000.00
-
Mar 29, 2021 · $4,800.00
-
Mar 29, 2021 · $56,375.00
-
Mar 29, 2021 · $142,509.00
-
Accept State Dept. of Education ESSER 2.0 Grant. $50,810,033.57
Mar 29, 2021 · $50,810,033.57
-
Mar 29, 2021 · $28,288.00
-
Mar 29, 2021 · $962,782.00
-
Mar 29, 2021 · $19,945,000.00
-
Mar 29, 2021 · $89,300.00
-
Mar 29, 2021 · $1,439,500.00 · $1,410,710.00
-
Mar 29, 2021 · $389,778.00
-
Mar 29, 2021 · $350,000.00
-
Mar 29, 2021 · $1,600.00
-
Mar 29, 2021 · $2,000.00
-
Mar 29, 2021 · $123,236.60 · $16,653.57
-
Mar 29, 2021 · $150,000.00
-
Feb 22, 2021 · $10,000.00
-
Feb 22, 2021 · $85,000.00
-
Feb 22, 2021 · $200,000.00
-
Feb 22, 2021 · $154,365.00
-
Feb 22, 2021 · $8,000.00
-
Feb 22, 2021 · $95,703.80
-
Approve purchase of student Chromebooks $4,200,000
Feb 22, 2021 · $4,200,000.00
-
Feb 22, 2021 · $232,600.00
-
Feb 22, 2021 · $25,000.00 · $25,000.00 to Knoxville-Knox County Planning
-
Approve acceptance of Emergency Rental Assistance award $14,152,916.70
Feb 22, 2021 · $14,152,916.70
-
Feb 22, 2021 · $50,000.00
-
Feb 22, 2021 · $50,000.00
-
Feb 22, 2021 · $28,750.00
-
Feb 22, 2021 · $250,000.00
-
Feb 22, 2021 · $325,000.00
-
Feb 22, 2021 · $5,700.00
-
Feb 22, 2021 · $1,429.00
-
Feb 22, 2021 · $14,000.00
-
Feb 22, 2021 · $226,553.55 · $70,250.00
-
Feb 22, 2021 · $3,270,500.00
-
Feb 22, 2021 · $26,123,600.00
-
Feb 22, 2021 · $9,600.00
-
Feb 22, 2021 · $10,000.00
-
Jan 25, 2021 · $37.00
-
Jan 25, 2021 · $37,500.00
-
Jan 25, 2021 · $9,960.19 · $9,326.00
-
Jan 25, 2021 · $9,517.99 · $10,000.00
-
Accept grant funds for Knox County Schools $41,103.30
Jan 25, 2021 · $41,103.30
-
Jan 25, 2021 · $54,000.00
-
Jan 25, 2021 · $355,900.00
-
Jan 25, 2021 · $47,000.00 to Volunteer Ministry Center · $266,508.00
-
Jan 25, 2021 · $7,428.49
-
Jan 25, 2021 · $250,000.00
-
Jan 25, 2021 · $117,134.00
-
Jan 25, 2021 · $17,061.47
-
Jan 25, 2021 · $115,100.00 · $76,737.00 to July
-
Jan 25, 2021 · $11,279,000.00 · $499,999.80 · $250,000.20 · $10,529,000.00
-
Jan 25, 2021 · $1,600.00
-
Jan 25, 2021 · $145,255.23
-
Dec 21, 2020 · $33,000.00
-
Dec 21, 2020 · $8,000.00
-
Dec 21, 2020 · $1,000.00
-
Accept Safe Schools Grant award $1,998,865.25
Dec 21, 2020 · $1,522,165.25 · $476,700.00
-
Dec 21, 2020 · $125,000.00
-
Dec 21, 2020 · $464,624.00 · $116,156.00
-
Accept grant funds for Knox County Schools $12,081.78
Dec 21, 2020 · $12,081.78
-
Approve contracts for high-speed printers $1,226,658
Dec 21, 2020 · $1,226,658.00
-
Dec 21, 2020 · $420,000.00
-
Dec 21, 2020 · $200,000.00
-
Approve grant contract for dental services $1,250,000
Dec 21, 2020 · $1,250,000.00
-
Dec 21, 2020 · $117,000.00
-
Dec 21, 2020 · $47,000.00
-
Dec 21, 2020 · $14,168.21
-
Dec 21, 2020 · $7,500.00
-
Dec 21, 2020 · $17,500.00
-
Dec 21, 2020 · $485,434.00
-
Dec 21, 2020 · $14,168.21
-
Dec 21, 2020 · $7,500.00
-
Nov 16, 2020 · $1,816,207.50
-
Nov 16, 2020 · $192,141.50
-
Nov 16, 2020 · $160,580.00
-
Nov 16, 2020 · $122,200.00
-
Nov 16, 2020 · $19,500.00
-
Nov 16, 2020 · $16,475.00
-
Nov 16, 2020 · $10,000.00
-
Accept $5,042.49 award for armored vests $5,042.49
Nov 16, 2020 · $5,042.49
-
Nov 16, 2020 · $20.00
-
Nov 16, 2020 · $5,000.00
-
Nov 16, 2020 · $6,000.00
-
Nov 16, 2020 · $680,571.00
-
Nov 16, 2020 · $250,000.00
-
Nov 16, 2020 · $189,800.00
-
Nov 16, 2020 · $280,260.00
-
Nov 16, 2020 · $1,600.00
-
Accept CARES Act funding up to $6,979,335.00 $6,979,335
Nov 16, 2020 · $6,979,335.00
-
Nov 16, 2020 · $33,000.00
-
Oct 26, 2020 · $7,527.00
-
Oct 26, 2020 · $50,000.00
-
Oct 26, 2020 · $25,000.00
-
Oct 26, 2020 · $6,250.00
-
Oct 26, 2020 · $343,300.00
-
Oct 26, 2020 · $15,000.00
-
Oct 26, 2020 · $5,395.00
-
Oct 26, 2020 · $53,993.75
-
Oct 26, 2020 · $323,989.00 · $136,793.74
-
Oct 26, 2020 · $110,500.00 · $42,040.07
-
Oct 26, 2020 · $25,000.00
-
Oct 26, 2020 · $6,000.00
-
Oct 26, 2020 · $450,000.00
-
Oct 26, 2020 · $53,500.00
-
Oct 26, 2020 · $1,000,000.00 · $50,000.00
-
Oct 26, 2020 · $15,000.00
-
Oct 26, 2020 · $685,782.00
-
Oct 26, 2020 · $250.00
-
Oct 26, 2020 · $60,000.00 to Stones River Group · $5,000.00
-
Oct 26, 2020 · $1,350.00 · $50.00
-
Oct 26, 2020 · $5,000.00
-
Sep 28, 2020 · $19.93
-
Sep 28, 2020 · $5,458,492.08
-
Sep 28, 2020 · $95,000.00
-
Sep 28, 2020 · $57,000,000
-
Sep 28, 2020 · $63,000,000
-
Sep 28, 2020 · $34,000,000
-
Sep 28, 2020 · $24,000,000
-
Sep 28, 2020 · $31,350.00
-
Sep 28, 2020 · $8,554.25 to November
-
Sep 28, 2020 · $38,999.06
-
Sep 28, 2020 · $1,480.00
-
Approve Sales Order/Service Agreement with Image Matters, Inc. for production print system. $144,550
Sep 28, 2020 · $144,550.00
-
Sep 28, 2020 · $80,000.00
-
Sep 28, 2020 · $40,000.00
-
Sep 28, 2020 · $494,801.00
-
Sep 28, 2020 · $75,000.00
-
Sep 28, 2020 · $15,000.00
-
Sep 28, 2020 · $3,924.00
-
Sep 28, 2020 · $14,940.00
-
Sep 28, 2020 · $191,548.51 · $98,676.51
-
Sep 28, 2020 · $25,000.00
-
Sep 28, 2020 · $22,579.06 · $17,417.00
-
Sep 28, 2020 · $130,000.00
-
Sep 28, 2020 · $385,000.00 to Community Action Committee · $175,097.00 · $100,000.00 · $50,000.00 to Volunteer Ministry Center
-
Sep 28, 2020 · $49,600.00 · $98,700.00
-
Sep 28, 2020 · $150,000.00
-
Sep 28, 2020 · $79,550.00
-
Sep 28, 2020 · $1,600,000.00
-
Sep 28, 2020 · $20,900.00
Contracts & vendor awards
Contract and purchase awards the minutes record — the vendor and the amount exactly as the record states them. Each is reviewed by a human before it appears here, and links to its own shareable page and the full decision.
Shows decisions recorded in official minutes. Applications or purchases made administratively, without a recorded vote, may not appear.
-
A Ground Lease with Strong Stock Farm, LLC for lease of approximately 120 acres on a portion of property located at 8217 Rutledge Pike was approved.
Contract awarded · Aug 31, 2026 · decision & source
-
The Second Amendment to the Administrative Services Agreement with BlueCross BlueShield of Tennessee, Inc. for the administration of employee medical insurance benefits was approved.
Contract awarded · Aug 31, 2026 · decision & source
-
A contract with EyeMed Vision Care, LLC for the provision of Employee Vision Benefit Services was approved.
Contract awarded · Aug 31, 2026 · decision & source
-
An agreement with Microsoft for the provision of Microsoft products and services was approved.
Contract awarded · Aug 31, 2026 · decision & source
-
A Service Agreement with Trane for preventative maintenance and repair services for Library facilities was approved.
Contract awarded · Aug 31, 2026 · decision & source
-
A Service Agreement with Trane for preventative maintenance and repair services for Sheriff’s facilities was approved.
Contract awarded · Aug 31, 2026 · decision & source
-
Johnson, Miriam, & Thompson (JMT) $108,000
The Professional Service Agreement with Johnson, Miriam, & Thompson (JMT) for right of way acquisition services for intersection improvements at Maryville Pike and Tipton Station Road in the amount of $108,000.00 was approved.
Contract awarded · Aug 31, 2026 · decision & source
-
A State Aid Contract with the Tennessee Department of Transportation (TDOT) for the resurfacing of Guinn Road was approved with an estimated project cost of $929,844.30.
Contract awarded · Aug 31, 2026 · decision & source
-
Whaley Construction, LLC $2,844,120.38
A construction contract with Whaley Construction, LLC in the amount of $2,844,120.38 for construction of the Gibbs Pedestrian Bridge Project was approved.
Contract awarded · Aug 31, 2026 · decision & source
-
Contract awarded · Aug 31, 2026 · decision & source
-
Scoir, Inc. $31,677.60
A K12 Terms of Service Agreement with Scoir, Inc. for a career readiness software platform was approved at a cost of $31,677.60.
Contract awarded · Aug 31, 2026 · decision & source
-
Teach for America $25,000
A professional services agreement with Teach for America for the Ignite Tutoring Program was approved at a cost of $25,000.00.
Contract awarded · Aug 31, 2026 · decision & source
-
ACT Education Corporation $17.50
Terms and conditions with ACT Education Corporation for the administration of the PreACT for 8th, 9th, and 10th grade students were approved at a cost of $17.50 per student.
Contract awarded · Aug 31, 2026 · decision & source
-
Jessica Swanson Consulting, LLC $22,500
A consulting agreement with Jessica Swanson Consulting, LLC for technical assistance on school programs was approved at a cost of $22,500.00.
Contract awarded · Aug 31, 2026 · decision & source
-
Powerschool Group, LLC $250,000
A contract with Powerschool Group, LLC for Technology Solutions, Products, and Services was approved at a cost up to $250,000.00.
Contract awarded · Aug 31, 2026 · decision & source
-
Hatching Results, Inc. $63,000
A contract with Hatching Results, Inc. for Secondary School Counseling Support was approved at an estimated cost of $63,000.00.
Contract awarded · Aug 31, 2026 · decision & source
-
Public Consulting Group LLC $110,000
A contract with Public Consulting Group LLC for an Alternative Schools Redesign was approved at an estimated cost of $110,000.00.
Contract awarded · Aug 31, 2026 · decision & source
-
Awarded a contract to THE BALDWIN GROUP for employee health-related insurance brokerage and consulting services.
Contract awarded · Jul 27, 2026 · decision & source
-
Awarded a contract to CLEARGOV, INC. for Disclosure Studio – ACFR Software for the Annual Financial Report.
Contract awarded · Jul 27, 2026 · decision & source
-
Awarded a contract to The Olson Group, Ltd. for workshops, training, and enhancement of the Regional Family Assistance Center Plan.
Contract awarded · Jul 27, 2026 · decision & source
-
Awarded a contract to RESTAURANT EQUIPMENT MAINTENANCE COMPANY (REMCO) for kitchen equipment maintenance and repair.
Contract awarded · Jul 27, 2026 · decision & source
Spending records
Financial actions the minutes record — a grant or donation accepted, funds appropriated. Each is reviewed by a human before it appears here, and links to its own shareable page.
-
Grant accepted · Food City Stores · Aug 31, 2026
-
Appropriation · Aug 31, 2026
-
Grant accepted · Aug 31, 2026
-
Grant accepted · Tennessee Department of Health · Aug 31, 2026
-
Grant accepted · Tennessee Department of Health · Aug 31, 2026
-
Grant accepted · Points of Light Foundation, d/b/a Points of Light · Aug 31, 2026
-
Grant accepted · Aug 31, 2026
-
Grant accepted · Tennessee Department of Transportation (TDOT) · Aug 31, 2026
-
Grant accepted · National Endowment for the Arts · Aug 31, 2026
-
Grant accepted · Aug 31, 2026
-
Grant accepted · Tennessee Department of Education · Aug 31, 2026
-
Grant accepted · Tennessee Department of Education · Aug 31, 2026
-
Grant accepted · U.S. ENVIRONMENTAL PROTECTION AGENCY · Jul 27, 2026
-
Grant accepted · UNIVERSITY OF TENNESSEE MEDICAL CENTER · Jul 27, 2026
-
Grant accepted · TENNESSEE STATE LIBRARY AND ARCHIVES · Jul 27, 2026
-
Authorized acceptance of $21,447.01 in grant funds and donations for Knox County Schools. $21,447.01
Grant accepted · Jul 27, 2026
-
Grant accepted · Lawson Family Foundation · Jul 27, 2026
-
Grant accepted · SSP INTERNATIONAL · Jul 27, 2026
-
Accepted a $1,102,186.34 grant from the Tennessee Department of Education for Carl D. Perkins Career and Technical Education. $1,102,186.34
Grant accepted · Tennessee Department of Education · Jul 27, 2026
-
Accepted a $7,570,075.08 grant from the Tennessee Department of Education for Summer Learning Camps. $7,570,075.08
Grant accepted · Tennessee Department of Education · Jul 27, 2026
-
Grant accepted · Tennessee Department of Education · Jul 27, 2026
-
Accepted $24,882,417.06 in grant funds from the Tennessee Department of Education for federal grants. $24,882,417.06
Grant accepted · Tennessee Department of Education · Jul 27, 2026
-
Appropriation · Jul 27, 2026
-
Appropriation · Jun 15, 2026
-
Appropriation · Jun 15, 2026
-
Appropriation · Jun 15, 2026
-
Appropriation · Jun 15, 2026
$ (for example $2,400,000), copy each one verbatim,
and sum them by the meeting's year and quarter. Only adopted motions count — a deferred,
failed, or withdrawn motion approved no money. Scaled figures like “$2.4 million”
written in words are deliberately skipped rather than guessed at. Per-resident figures divide the
total by the cited population. See
Methodology.